Politics & Government

Makeover Planned for Downtown Parking Lot

Design plans for an overhaul of the parking lot behind the 100 block of Franklin Street in Port Washington's downtown will be introduced in early April.

Design plans for an overhaul of the parking lot behind the 100 block of Franklin Street in Port Washington's downtown will be introduced in early April.

The Main Street Design Committee will present the plans during a meeting at 6:30 p.m. April 8 at the Blue Heron Artisan Gallery, 102 E. Pier St., according to an Ozaukee Press article. Though the lot will have about the same number of parking spots after the redesign — about 60 — the traffic flow will change.

The design also includes landscaping, but with plants low enough that water views are not impeded, the article said. The plans will require approval by city committees as well as the Common Council.

Find out what's happening in Port Washington-Saukvillewith free, real-time updates from Patch.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here

More from Port Washington-Saukville